Exterior
Exterior of building will be soft washed using a mild bleach, TSP, and Dawn dish detergent mixture to remove dirt and mildew.
Siding on building which includes shingles, barnboard siding, and clapboard siding in front of building will be prepped as needed and painted 2 coats of Sherwin Williams Latex Acrylic Woodscapes stain. Please note- area up on north side of roof where shingles are severely deteriorated will not be painted. We realize they will be getting replaced at a later time with Hardie Board.
All trim on building will be scraped and sanded as needed.
All open joints, gaps and seams will be caulked, including around windows.
Bare areas will be spot primed and we will apply 1 coat of Sherwin Williams Satin Duration paint.
The scope of work will include painting/ staining small side deck on building, however larger decks and wheelchair ramp are currently natural and we will not be staining this area.
Shutters will be removed, primed, painted, and reinstalled upon completion.
Doors on building will be painted your choice of color.
We realize there are approximately 10-12 pieces of rot. We will replace them with PVC composite so they will not rot in the future.
While painting we will take precautions to cover roofs, walkways, etc. to prevent paint spatter.
Labor and materials: $12,500
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Client Information
Signed by brian snowdale (emailed copy) on Mon Aug 19 2024 08:56:58 GMT-0400 (Eastern Daylight Time)
IP Address: 24.62.187.1