12 Commons Drive Carver, MA 02330
508-746-6432
mnelson119@comcast.net
www.nelsonpainting.com


Estimate


Charlie Natale

10 Priscilla Beach Rd
Plymouth, MA 02360

08/06/2024
617-620-9303
cjnatale1@gmail.com


Exterior

Complete exterior of home will be soft washed using a mild Dawn cleaning detergent to remove any dirt, sea salt, mold, mildew, etc. This will not harm plants or shrubs.

All shingles on home will be lightly sanded using a random orbital sander to remove loose flaking paint and to ensure good paint adhesion.

Shingles will have 2 coats of Sherwin Williams Woodscapes Latex Acrylic Siding Stain applied by brush and roll.

While staining shingles we will remove downspouts so we are able to paint behind them. Downspouts will be chemically cleaned, primed and painted to match the color of the shingles on the home, and reinstalled upon completion.

Trim on home will be lightly sanded to ensure good paint adhesion and we will apply 2 coats of Sherwin Williams Satin Duration paint.

Prior to painting we will caulk all open joints, gaps, and seams. All nail holes will be puttied.

This will include painting of deck skirting as well as all beams under deck.

We will make a sample of ipe oil inside of the shower as we discussed for your approval. Once approved we will do bathroom floor, bathroom seat, outdoor shower, small front deck, and front steps.

While painting we will take precautions to cover roofs, walkways, plantings etc. to prevent paint spatter.

Labor and Materials: $27,900

Option 2- Front door

Front door will be thoroughly sanded down to bare wood as much as possible. Darker stained areas on door that is weathered around the joints will be bleached for a more uniform appearance.

Door will be sealed and 2 coats of Sikkens stain applied.

Labor and Materials for Option 2: $1,500

Option 3- Back Stairway Leading to Basement

All natural wood in this area will be lightly sanded, sealed, and polyurethaned- we recommend a satin finish.

Labor and Materials for Option 3: $400

Total Labor and Materials: $29,800

Upon winning bid we will supply you our workers comp and general liability certificates.

We estimate this job to take about 2- 2.5 weeks and we would be able to start mid- September



A copy of our Workman’s Compensation and Liability Insurance is available upon request.

WE PROPOSE: hereby to furnish materials and labor-complete accordance with the above specifications, for the sum of: $

All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike manner according to specifications submitted, per standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. Our workers are fully covered by Workers Compensation insurance.

Acceptance Of Proposal The above prices, specifications and conditions are satisfactory and hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.

Note: This proposal may be withdrawn by us if not accepted within 30 days.

Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.

After the document is signed, you can proceed to print it or save it as a PDF.



Client Information
Signed by Charles J. Natale, Jr. on Mon Aug 12 2024 09:59:09 GMT-0400 (Eastern Daylight Time)
IP Address: 24.63.126.115