Exterior Painting -
Option 1 -
Clapboards on sides of building we realize half is vinyl siding as well as the back and won't be painted.
Clapboards on each side of building approximately half way down and all wood surfaces on front of building -
Will scrape and sand as needed.
Bare areas will be spot primed.
Will apply 1 complete coat of Sherwin Williams Satin Duration White Paint to all wood surfaces.
Side door on building that is currently rusty will be primed with Rustoleum Primer and painted with Sherwin Williams Satin Duration Paint.
Also includes entire front as well as front ceiling but does NOT include repairing or paint any columns.
Labor and Materials: $3,900
Option 2 -
Replacing wood on columns
Several of the columns seem extremely deteriorated and falling apart. There have been a lot of repairs over the years and so a lot of the wood types don't match up, as well as rusty nails and rot.
I recommend removing the outer wood from the columns and apply Azek trim to all 4 sides of the columns as well as adding the decorative moldings. This would solve many problems of rot and deterioration.
We would replace with Azek composite material and it would just be straight grain with no fluted details.
Labor and Materials: $2,000
If you would like the fluted detail to match on each column we would have to apply with a router and would be an additional cost of $800
**All debris will be removed. We will dispose of old wood around columns.
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Client Information
Signed by signed contract and sent via email on Tue Sep 26 2023 14:58:22 GMT-0400 (Eastern Daylight Time)
IP Address: 24.62.187.1