Interior Painting of G Pub or any other of your properties
We bill out at the rate of either 2 men or 3 men per half day or full day. An example payment would be 2 men for up to 4 hours is $400. 2 men up to 1 full day is $800. 3 men up for up to half day is $600. 3 men for up to 1 full day is $1,200. These are labor charges only. All materials will be over and above this price.
G Pub Building - 101 Carver Rd, Plymouth
Scope of work to include G Pub building- 2 sides and back of building. There will be no work performed on the front of the building.
Sides and back of building will be thoroughly power washed to remove dirt, mildew, and to help remove loose flaking paint.
Paint is scaling so severe that we will need to go over it with scrapers to remove as much flaking paint as possible.
All bare areas will be spot primed.
Building will be sprayed and back rolled for maximum protection and to get in all the cracks of the blocks.
Downspouts and trim along roof that are severely faded we would suggest blending in with the body color.
Doors on back of building will be prepped as needed by washing, sanding, rusty doors will be primed and top coated in your choice of color.
Labor and Materials: $78,640
Dollar Tree Building - 91 Carver Rd, Plymouth
Scope of work to include 2 sides and back of building.
Sides and back of building will be thoroughly power washed to remove dirt, mildew, and to help remove loose flaking paint.
Paint is scaling so severe that we will need to go over it with scrapers to remove as much flaking paint as possible.
All bare areas will be spot primed.
Building will be sprayed and back rolled for maximum protection and to get in all the cracks of the blocks.
Downspouts and trim along roof that are severely faded we would suggest blending in with the body color.
Doors on back of building will be prepped as needed by washing, sanding, rusty doors will be primed and top coated in your choice of color.
Labor and Materials: $81,500
Front of Savers Building - 10 Pilgrim Hill Rd, Plymouth
Brick area in the front of building that is different from the two ends will be power washed, primed, and painted your choice of color.
Labor and Materials: $14,250
Front trim as well as peak/ gables will be prepped as needed and painted 2 coats your choice of color.
Labor and Materials: $17,500
Ceilings on front of building that run the length of the building will be power washed to remove dirt and mildew, and painted 2 coats your choice of color or sealed and polyurethaned.
Labor and Materials: $10,000
Total cost for the 3 sides of G Pub, complete painting of Dollar Tree building, and front of Savers building: $201,890
Papa Gino's Building - 81 Carver Rd, Plymouth
We weren't sure if you wanted this building quoted or not. If so we just need to know what you want done- just trim or to include the bricks too? We will send a separate quote for this building if you would like to do that. This quote is limited to the 3 sides of G Pub, complete painting of Dollar Tree building, and front of Savers building.
While painting we will bring in all necessary machinery, lifts, power washers, sprayers, etc. We will take precautions to cover the ground to contain as much loose flaking paint as possible however at the end we will need to do a thorough clean up. Upon winning bid we will provide you with our workers comp liability certificates.
All Sherwin Williams paints will be used on this project.
For painting projects of this size we require 1/3 payment up front, 1/3 when painting is halfway completed, and 1/3 upon completion. All payments are due within 14 days of the invoice.
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Print Name