Exterior Painting - Scope of work to include painting of front clapboards on home as well as complete trim on house, including inside of sunroom, doors on back of house and around sunroom area.
Areas of home will be power washed as needed. This will include window sills that are green, gutters, porch ceiling, porch floor, as well as floor on sun porch.
Downspouts on home will be removed while painting and re-installed upon completion.
Trim will be prepped as needed.
Loose flaking paint will be scraped and sanded.
All open joints, gaps and seams will be caulked.
Bare areas will be spot primed.
Will apply 1 complete coat of Sherwin Williams Satin Duration paint to all trim.
Clapboards on home will be prepped as needed.
Will be painted 1 coat same color.
Ceiling on front porch will be stained in a color or clear coat.
Small front porch will be clear coated, porch on sunroom will be coated with either cedar or clear coated - your choice. (We recommend clear)
We will replace approximately 8-10 pieces of rotted wood.
In front of house when replacing rot we will replace board completely not just piece it in.
Smaller rot areas on side of house will be cut back and small piece will be installed not a complete board.
Back of home where wooden steps are going into garage will build 2 new steps out of Trex decking for maintenance free surface.
Labor and Materials: $9,500
**Upon completion will leave any extra leftover paints for future touch ups.
**While painting will take precautions to cover roofs, walkways, etc. to prevent paint spatter.
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Client Information
Signed by Mary Strachan on Fri Mar 22 2024 19:40:52 GMT-0400 (Eastern Daylight Time)
IP Address: 73.249.182.197