Exterior- Scope of work to include complete exterior painting of building
Soft Wash
Building will be soft washed using a mild bleach, TSP, Dawn dish detergent mixture to remove dirt and mildew particularly the back side and alley area. This will not harm plants or shrubs.
Trim
All trim will be prepped as needed by scraping and sanding loose flaking paint.
Bare areas will be spot primed.
All open joints, gaps and seams will be caulked.
We will apply 1 complete coat of Sherwin Williams Satin Duration premium paint to all trim.
Siding
All siding will be prepped as needed by scraping and sanding.
Bare areas will be spot primed.
We will apply 1 complete coat of Sherwin Williams Flat Duration premium paint to all yellow siding.
*We will not be painting any of the windows as they are vinyl.
Shutters will be removed and reinstalled upon completion. We will not be painting them.
While painting we will take precautions to cover roofs, walkways etc. to contain as much flaking paint as possible and to prevent paint spatter.
We understand the shops will be open while we are working and we will take all necessary precautions.
Labor and Materials: $48,725
We will require a $10,000 deposit to get project started and the remaining $38,725 to be paid upon completion
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Print Name