Buildings B & C top portion above roofline
Option 1
Clapboards will be prepped and sanded as needed.
Any rotted wood will be replaced.
Will apply 1 coat of Woodscapes Siding Stain.
Trim will be scraped and sanded as needed.
Open joints, gaps and seams will be caulked.
Rotted wood will be replaced.
Bare wood will be spot primed.
Will apply 1 complete coat of Sherwin Williams Satin Duration paint, color to remain the same.
Labor and Materials: $5,900
Additional Cost- We will need to bring in a man lift for 1 week. We got several quotes and the best price we could find is $1,900 for 1 week.
Total for Option 1 with man lift: $7,800
Option 2- Building A
Paint new window trim and touch up peeling paint behind Unit A2
Labor and Materials: 350
Option 3- Building B
Paint behind Building B and replace rake board on Unit B1 above deck.
Paint side of unit B3.
Labor and Materials: $3,500
Option 4- Building C
Paint lower sections.
Replace trim boards by entrance of Unit C1 with PVC.
Labor and Materials: $2,100
Paint front doors on units 2 coats: $80 per door
Paint lamp posts 2 coats satin black metal paint: $40 each lamp post
Paint mailbox 2 coats satin black metal paint: $150
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Print Name