Interior- First floor bedroom, bathroom, closet. Second floor bathroom. Living room, dining ceiling, complete basement, & other small areas that need repairs due to patch work of the most recent project.
Plastered areas will be primed.
Ceilings will be painted flat white.
Walls will be painted 2 coats your choice of color.
Nail holes in trim will be puttied, we will caulk open joints gaps and seams, and paint 2 coats of semigloss white.
Wallpaper on lower portion of basement walls will be removed and residue will be washed off prior to painting.
Living room where new barn doors were installed- wall will be chipped back to a sound surface, patched with joint compound, and painted.
Rocks around fireplace in basement will be primed with masonry primer and painted your choice of color.
One wooden beam in basement will be sanded, primed, and painted white. All other natural/ stained colored woodwork will not be painted.
Ceiling in basement will not be painted.
Rock/ masonry under bar will not be painted
While painting we will take precautions to cover flooring and furnishings as needed.
Labor and Materials: $8,500
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Print Name