Option 1- Painting of front of house trim and clapboards
Front of house trim and clapboards will be prepped as needed.
Loose flaking paint will be sanded.
Open joints, gaps, and seams will be caulked.
Bare areas will be spot primed.
We will apply 2 complete coats of Sherwin Williams Duration paint to complete front of house.
Labor and Materials: $2,900
Option 2- Soft Wash
If you would like the house soft washed to remove dirt and mildew, we noticed it to be pretty severe especially on sides and back of house, and we would recommend soft washing using a mild bleach, TSP and Dawn dish detergent mixture. This will not harm plants or shrubs.
Labor and Materials: $450
Option 3- Painting of trim on 2 sides and back of home
Trim will be prepped as needed.
Loose flaking paint will be scraped and sanded as needed.
Bare areas will be spot primed.
We will apply 2 complete coats of Sherwin Williams Satin Duration paint.
Labor and Materials: $3,200
Total for All Options: $5,650
While painting we will take precautions to cover roofs, walkways, etc. to prevent paint spatter.
Upon completion we will leave all extra paints for future touchups.
Please sign using a stylus, your mouse, or your finger below to authorize this contract. By electronically signing this document, you agree to the terms established above.
After the document is signed, you can proceed to print it or save it as a PDF.
Print Name